|
| MIL-F-50542A (AR)
4.3
First article inspection.
4.3.1 Submission. - The contractor shall submit a first
article sample as designated by the Contracting Officer for
evaluation in accordance with provisions of 4.3.2. The first
article sample shall consist of the following items in sam-
ple quantities as indicated.
Drawings
Part description
Quantity
Fuze for Flechette Warhead,
WDU-4A/A (with Expulsion
Charge)
65C11046
50
Charge Assembly, Expulsion
65C1105O
25
4.3.2 Inspection to be performed. - See MIL-A-48078
and Table I specified herein.
4.3.3
Rejection. - See MIL-A-48078
4
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |