Click here to make tpub.com your Home Page

Page Title: Submission of alternative inspection provisions.
Back | Up

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




MIL-F-51539A
blocks the "TO SHELTER" port in the closed position. In the open position, the door blocks
the "TO PROT ENT" port (i.e. the. "TO SHELTER" port is not blocked).
6.4 Interplant shipment. Packaging and marking for interplant shipment is for supplies
and materials that do not directly enter the military supply system. Typical interplant ship-
ments are shipments from a vendor to a subcontractor or a prime contractor, or between
contractors and subcontractors, or from a vendor or contractor to a military arsenal, plant,
or other activity for evaluation immediate use. or further processing as specified in the
applicable contract.
6.5 Submission of alternat ive inspection provisions. Proposed alternative inspection
provisions should be submitted by the contractor to the procuring contracting officer for
evaluation and approval by the technical activity responsible for preparation of this specifi-
cation.
6.6 Changes from previous issues.  Marginal notations are not used in this revision to
identify changes with respect to the previous issue due to the extensiveness of the changes.
6.7 Subject term (key word) listing.
Airflow valve
Compartment control module
Filter unit
Preparing activity:
Custodian:
Army - EA
Army
-
EA
Project No. 4240-A008
17

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business