|
| MIL- F-81966( AS)
(3) If Initial Production Tests of 4.3 are required and if so the
designated Government laboratory.
(4) If Reliability Sampling Phase Tests of 4.4.3.2 are to be deleted and,
if so which lots.
6.5 Asterisk - In specification revisions and superseding amendments, an
asterisk "*" preceding a paragraph number denotes paragraphs in which changes have
been made from the previous issue. This has been done as a convenience only and the
Government assumes no liability whatsoever for any inaccuracies in these notations,
Bidders and contractors are cautioned to evaluate the requirements of this document
based on the entire content as written irrespective of the asterisk notations and
relationship to the last previous issue.
6.6 Associated Equipment - The equipment shall operate with the following
associated equipment:
(1) Fuze Function Control Test Set AN/AWM-42A
(2) Test Interconnecting Kit MK-1250/AWM-42
(3) Electrical Equipment Rack MT-38O4/AWW-2A
Project No. 1290-NS22
31
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |