|
| MIL-G-46858A
Paragraph
Page
Telemetry equipment
3.4.1.2
3
Tests
acceptance
4.5
22
electrical
4.6.2
22
environmental
4.7
22
flight
4.8
23
mechanical inspection
4.6.1
22
performance
4.6.3
22
preproduction
4.4
21
Test conditions
4.3
20
Test equipment accuracy
4.3.2
21
Test methods
4.6
22
Time delay
6.3.28
29
*Tools, special
3.4.5.1
4
Transmission link
3.5.2.1.7
8
Transmission link (definition)
6.3.29
29
Transmitters
3.5.2.3
10
beacon
3.5.2.3.1
10
monitor
3.5.2.3.2
10
Transmitter power tube conditions
3.5.2.3.4.1
11
Tuning
3.5.2.1.12.5
9
Vehicle induce acceleration effects
6.3.30
30
Video/audio distortion
3.5.2.1.10
8
Video/audio output
3.5.2.1.9
8
*Voltage standing wave ratio (VSWR)
3.5.2.3.4.7
11
Warm-up time
3.5.2.1.1
8
Water recoverable missiles
3.4.16.8
7
Watertightness
3.4.13
5
Weight
3.4.4.3
4
Workmanship
3.8
20
43
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |