|
| MIL-13-48215(MU)
5.2.1.2 Level C. The hook shall be packed in accordance
with dwg 8808362 except that the moisture barrier may be
omitted.
5.2.2 Packing.
5.2.2.1 Level A and C. The hook shall be packed in
accordance with dwg 8883536 and 8808362.
5.2.3 Marking. Marking shall be as specified in
accordance with dwg 883536 and 8808362 as applicable.
6.
NOTES
6.1 Orderinq data. Procurement documents should specify
the following:
6.1.1 Procurement requirements.
a. Title, number, and date of this specification.
b. Production or Repair Parts.
c. Selection of applicable level of packaging and
packing required (see 5.1 and 5.2).
6.1.2 Contract data requirements (see 4.3.4.1) . Data
specified in 4.3.4.1 will be delivered as identified on a
numbered DD Form 1664 when specified on a DD Form 1423 incor-
porated in the contract.
6.2 Objective evidence. Records of contractor quality
control and inspections which can be verified.
6.3 Acceptance inspection equipment (see 4.3.4.1). The
contractor shall obtain approval from the commander, Picatinny
Arsenal, Dover, New Jersey 07801, ATTN: SMUPA-QA-N-I .
Custodian:
Preparing Activity:
Army - MU
Army - MU
Project No. 1190-A057
7
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |