Click here to make tpub.com your Home Page

Page Title: Equipment Tabulation
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




MIL-I-12822C(MU)
DRAWINGS
ARMY
7548439 - Igniter, M25, Loading Assembly
7548839 - Carton, Packing, Ammunition for Igniter,
Rocket Motor, M26, Assembly, Details and
Packing
7548840 - Box, Packing, Ammunition for Igniter, Rocket
Motor, M26, Assembly, Details and Packing
PUBLICATIONS
ARMY
ET-7548439 - Equipment Tabulation
(Copies of specifications, standards, drawings and publications
required by suppliers in connection with specific procurement
functions should be obtained from the procuring activity or as
directed by the contracting officer.)
3. REQUIREMENTS
3.1 Material. - Materials and parts shall be in accordance
with applicable drawings and specifications.
3.2 Igniter. - The igniter shall comply with all require-
ments specified on Drawing (dwg.) 7548439, and with all require-
ments specified in applicable specifications.
3.3 Black powder.
3.3.1 Moisture content. - The moisture content of the black
powder at the loading plant, at the time of loading, shall not
exceed 0.5 percent.
3.3.2 Exposure to air. - The black powder, after determina-
tion of the misture content, shall not be exposed to air during
weighing and loading operations more than ten minutes total accumu-
lated time.
3.4
Functioning.
3.4.1 Time. - The igniters shall function in not less than
14 seconds and not more than 16 seconds when tested as specified
in 4.4.4.
2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business