Click here to make tpub.com your Home Page

Page Title: Quality Assurance Provisions
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-I-51175(MU)
All components of the installation kit shall conform to the
3.1,2 Components.
s p e c i f i c a t i o n s and drawings listed on Drawing DM-19-1819 and subsidiary drawings.
All components of the installation kit shall be
3.2 Manufacture and assembly.
manufactured and assembled in accordance with their respective assembly drawings
Electrical components shall function properly and
listed on Drawing DL5-19-1819.
have electrical continuity, as applicable, when tested as specified in 4,6.1.
A l l metal parts of the installation kit shalI be free of burrs
3.3
Workmanship.
and sharp edges and defects such as bent, broken, or cracked members, AlI rubber
parts shalI be smooth, of uniform thickness, and free of cuts, breaks, abrasions,
and molding defects.  Wiring shall be free of kinks and cuts, breaks, and abrasions
AlI parts shalI be free from foreign matter such as dirt or
of the insulating surface.
grease.
4.
QUALITY
ASSURANCE
PROVISIONS
Supplier's responsibility will be as specified
4.1
Responsibility
for
inspection.
in the contract or order.
4.2
Special
provisions.
T h e supplier may utilize any alternative
4.2.1
Alternative
inspection.
inspection procedure which wilI provide equal or better assurance of quality by
submitting a written proposal with justification and obtaining written approval from
the Government prior to instituting the procedure. In case of dispute, the procedures
o f this specification will govern.
The supplier shalI provide objective evidence
4.2.2
Objective
evidence.
acceptable to the contracting officer that the requirements of 3.1 and section 5
for which specific inspection has not been provided in this specification have
been
satisfied.
4.3
Lotting.
A lot shalI consist of the installation kits produced by one manu-
facturer, at one plant, from the same materials, under essentially the same manu-
f a c t u r i n g conditions.
4 . 4 Sampling for examination and nondestructive tests. Sampling shall be .
c o n d u c t e d in accordance with Standard MIL-STD-105.
3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business