Click here to make tpub.com your Home Page

Page Title: Table II. Test schedule.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-I-52997(ME}
4.5.2.2 Test schedule.
TABLE II. Test schedule.
4.5.2.3 Test procedures (initial production testing}. One or more intial
production kits, selected at random, shall be examined for the characterisitics
listed in column 3 of tabIe I and subjected to the test specified in column 3 of
table II to determine conformance.
4.6 Inspection comparison.  The Government may select fixtures at any time
during the initial production period and subject these kits to the examinations
specified in 4.4.2 and the tests specified in 4.5.2 to determine conformance to
the requirements of this specification. The inspection will be performed by the
contractor at the contractor's location and witnessed by Government inspectors
on fixtures selected at random from those which have been accepted by the
Government but wilI not include the previously inspected initial production
fixtures.  In addition to any test specified as part of the inspection
comparison, the Government reserves the right to conduct any and. all other tests
contained in this specification as part o:f the inspection comparison. Failure
of such additional tests shall have the same effect as failure of those tests
specified. as i.nspection comparison..
4.6.1 Inspection failure. Failure of an inspection comparison kit to meet
any requirement specified herein during and as a result of the examination and
tests specified in 4.5.2 shall be cause for rejection of the inspection
comparison fixture and shall be cause for refusal by the Government to continue
acceptance of initial production kits until remedial evidence has been provided
by the the contractor, at no cost to tie Government, on kits accepted and
produced under the contract. Any deficiencies found as a result of the
inspection comparison will be considered prima facie evidence thst all kits
accepted prior to the completion of inspection comparison are similarly
deficient, unless evidence to the contrary is furnished by the contractor and
such evidence is acceptable to the contracting officer.
4.7 Inspection of packaging.
4.7.1 Examination  The preproduction pack shall be examined for the defects
specified in table III. Presence of one or more defects shall be cause for
rejection.
4.7.1.1 Tests. The kit, prepared for shipment shall be subjected to the
pendulum impact test in accordance with FED-STD-101, test method 5012. At the
conclusion of the test, any shifting of packed components, loosening or breaking
of holdown provisions, ties, blocking or bracing, or any damage to system
components shall constitute failure of the test and because for rejection.
8

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business