|
| MIL-I-70756 (AR)
4.3 First article inspection.
4.3.1 Submission. The contractor shall submit a first
article as designated by the Contracting Officer for evaluation in
accordance with the provisions of 4.3.2. The first article sample
shall consist of the following items in sample quantities as
indicated.
Quantity
Drawings
Parts description
Inert Projectile Assembly Less
25
12902879
Escapement Assembly
25
9399382
Body Insert
50
9399390
Ogive Assembly, 40M, M918
50
9399391
Firing Pin Assembly
25
9399392
Firing Pin
25
9399393
Firing Pin Plate
25
9399394
Ogive M918TP
50
9399395
Spring, Anti-creep
25
9399396
Body
50
9399402
Body Assembly
4.3.2
Inspections to be performed.
See MIL-A-48078 and Table
I herein.
See MIL-A-48078.
4.3.3 Rejection.
4
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |