MIL-K-70493(AR)
4.4.3 Failure of sample. Should any one item of a special
sampling fall to meet the specified test requirements, acceptance
of the represented inspection lot will be suspended by the
Government until necessary corrections have been made by the
contractor and resubmitted items have been approved in accordance
with "Acceptance and Rejection" as specified in MIL-STD-105.
4.5 Inspection equipment. Except as otherwise provided for
by the contract, the contractor shall supply and maintain
inspection equipment in accordance with the applicable
requirements of MIL-I-45607.
4.5.1 Government furnished inspection equipment. Where the
contract provides for Government furnished test equipment, supply
and maintenance of test equipment shall be in accordance with the
applicable requirements specified in MIL-I-45607.
4.5.2 Contractor furnished inspection equipment.
4.5.2.1  Government  desiqn.  All  inspection  equipment
specified by drawing number in specification or QAP forming a part
of the contract shall be supplied by the contractor in accordance
with technical data included in the Technical Data Package List
(TDPL).
4.5.2.2 Contractor design. In the absence of Government
inspection equipment design, the contractor shall design and
supply inspection equipment compatible with the "Test Methods and
Procedures" specified in 4.6 of this specification and with the
component inspection procedures specified in "Examination" and
"Test Facilities" requirements of MIL-F-13926. Since tolerance of
test equipment is normally considered to be within 10% of the
product tolerance for which it is intended, this inherent error in
the test equipment design must be considered as part of the
prescribed product tolerance limit. Thus, concept, construction,
materials, dimensions, and tolerance used in the design of test
equipment shall be so selected and controlled as to insure that
the test equipment will reliably indicate. acceptability of a
product which does not exceed 90% of the prescribed tolerance
limit, and permit positive rejection when non-conforming.
Construction shall be such as to facilitate routine calibration of
test equipment.
4.5.2.3 Inspection equipment design requirements.
4.5.2.3.1 Temperature testinq. The volume of the test
chamber shall conform to the test facilities requirements of
MIL-F-13926. The air temperature at the control sensor shall be
in accordance with the specified requirements within plus or minus
2.5F  (1.4C).  The  temperature  gradient  across  the
cross-sectional area occupied by the test item shall not exceed
8