Click here to make tpub.com your Home Page

Page Title: Detailed functional requirements
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
NIL-K-81779C(AS)
Not applicable.
3.2.8
Calibration cycle.
Performance.
3.3
General.
The STK shall consist of a tool box (Kennedy
3.3.1
Part No. K-24 or equivalent) containing the items listed in Table I
for maintaining certain weapon replaceable assembles (WRAs) used in
AN/AWG-9, and portions of AN/AWM-23(V) Test Set.
Not applicable.
3.3.2
Organizational level functional requirements.
Applicable.
Intermediate level functional requirements.
3.3.3
Warm up time.
Not applicable.
3.3.4
3.4
Detailed functional requirements. The tools listed in Table I
shall be used in repairing and maintaining the WRAs tested at the various
test stations specified, and for repairing and maintaining the AN/AWM-
23(V) Test Set.
Workmanship.
3.5
Applicable.
See Table I.
3.6
Elements.
4.
Quality assurance provisions.
4.1
Responsibility for inspection. Applicable.
Applicable.
4.2
General.
4.2.1
Classification.
Applicable.
4.2.2
Individual items.
Applicable.
4.2.3
Applicable.
In-process inspection.
4.2.4
In-process data.
Applicable.
4.2.5
Acceptance test plan.
Applicable.
Table II shall apply.
Test results.
4.2.6
Applicable.
4.2.7
Acceptance.
Applicable.
4.2.8
Utilities.
Applicable.
4.2.9
Applicable.
Configuration.
5

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business