a description covering controls for lot formation and identifi-
cation, inspections to be performed, inspection stations,
sampling procedures, methods of inspection (measuring and testing
equipment) and provisions for control and disposition of
non-conforming material. The written description will be
considered acceptable when, as a minimum, it provides the quality
assurance required by the provisions of 4.2 and 4.3 and the
other documents referenced herein. The contractor shall not
be restricted to the inspection station or the method of
inspection listed in this specification provided that an
equivalent control is included in the approved quality assurance
In cases of dispute as to whether certain procedures
procedures.
of the contractor's system provide equal assurance, the comparable
procedure of this specification shall apply. The contractor
shall notify the Government of, and obtain approval for, any
change to the written procedure that affects the degree of
assurance required by this specification or other documents
referenced herein.
4.1.2 Submission of product.-At the time the completed
lot of product is submitted to the Government for acceptance, the
contractor shall supply the following information accompanied by
a certificate which attests that the information provided is
correct and applicable to the product being submitted:
a. A statement that the lot complies with all quality
assurance provisions of the approved current written description
of the system.
b. Quantity of product inspected.
c. Results obtained for all inspections performed.
d. Specification number and date, together with an
identification and date of changes.
Certificates of analysis of all material procured
directly by the contractor including a statement that NaCMC has
been used.
f. Quantity of product in the lot.
g. Date submitted.
The certificate shall be signed by a responsible agent of the
certifying organization. The initial certificate submitted shall
be substantiated by evidence of the agent's authority to bind his
principal.
Substantiation of the agent's authority will not be
required with subsequent certificates unless, during the course
of the contract, this authority is vested in another agent of the
certifying organization.
4.1.3 First article inspection
4.1.3.1 Submission.-The contractor shall submit a first
article quantity as designated by the Contracting Officer for
evaluation in accordance with the provisions of 4.1.3.2 (see 6.2).
The first article sample shall consist of 250 grams of material.
4
|