Click here to make tpub.com your Home Page

Page Title: Table II. End item visual defects for harness assembly
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-L-43693A(GL)
4.4.2 In-process inspection. Inspection of subassemblies shall be made to
ascertain that construction details shich cannot be examined in the firished
product are in accordance with specified requirements. The Government reserves
the right to exclude from consideration for acceptance, any material or service
for which in-process inspection has indicated nonconformance.
4.4.3 End item visual examination.
4.4.3.1 Harness assembly. The end items shall be examined for the defects
listed in table II. The lot size shall be expressed in terms of harness
assemblies. The sample unit shall be one harness assembly. The inspection
level shall be III and the acceptable quality level (AQL), expressed in terms of
defects per hundred units, shall be 0.25 for major defects and 6.5 for total
(major and minor combined) defects.
TABIE II.
End item visual defects for harness assembly
Classification
Examine
Major  Minor
Defect
101
Not specified type or class
Webbing, (nylon and
Cut, tear, hole, abrasion, or
cotton elastic)
102
Weak area
Ends not seared or wax dipped
201
as specified
202
color not as specified
Metal components
Fractured, malformed, bent, or
103
otherwise damanged
104
Burrs or sharp edges
Finished not as specified or any
corroded area
105
106
Not type, class, or size specified
Thread (nylon)
203
Color not as specified
107
stitching pattern not as specified
Stitches and
108
Any row of stitching missing
stitching
One stitch per inch fewer than
minimum or more than maximum
204
specified
Two or more stitches per inch
fewer than minimum or more than
109
maximum specified
Thread breaks, bobbin runouts,
110
skipped stitches, and runoffs
Ends of stitching not backstitched
111
or secured as specified
6

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business