4.5.3.3 Endurance testing.
4.5.3.3.1 Lot size. The initial endurance test lot size shall
consist of the initial month's production; subsequent endurance test lot
size shall consist of 100 loaders.
4.5.3.3.2 Procedure. One loader shall be selected from each
endurance test lot and tested for endurance (see 3.3.2) using the test
method specified i 4.6.2. Failure of the loader to meet the requirements
shall be cause for rejection of the represented lot.
4.5.3.4 Interchangeability testing.
4.5.3.4.1 In plant.
4.5.3.4.1.1. Loaders. A sample of three loaders selected from each
month's production shall be tested for interchangeability (see 3.4) using
the test method specified in 4.6.3.1.1. Loaders taken for interchange-
ability testing shall have been found satisfactory in all other examinations
and test. The three loaders shall be tested for functioning and torque
requirements after interchange of parts using the test methods specified
in 4.6.1 and 4.6.1.1 respectively. Failure of loaders to meet the require-
ments of the interchangeability test shall be cause for rejection of the
represented lot.
4.5.3.4.1.2 Concurrent repair parts. At least two parts from each
inspection lot of concurrent repair parts shall be subjected to the inter-
changeability test specified in 4.6.3.1.2. Failure of any part to meet
the requirements shall be cause for rejection of the represented lot and
the contractor shall perform the corrective action as specified in
4.5.3.1. Parts subject to reconditioning and further test shall become a
reconditioned lot and a sample of double the number of parts used in the
original test shall be tested from each reconditioned lot using the test
method specified in 4.6.3.1.1.
4.5.3.4.2 Interplant. When loaders are manufactured concurrently
by more than one contractor, each contractor shall forward monthly three
loaders for the interplant interchangeability test specified in 4.6.3.2.
(see 6.2). The contractor shall be informed of any failure of the loader
to meet prescribed requirements. Upon completion of testing agency
inspection, samples may be commercially packaged and will be returned to
the contractor for  s repackaging in accordance with procurement documents
at the contractor expense.
4.5.3.5 Certification. Unless otherwise specified, the contractor
shall furnish the Government representative with certified statements
that each inspection lot conforms to the applicable drawings, specifi-
cations of the materials and processes specified on Drawing 65D9843.