|
| ![]() MIL-L-51513(EA)
Acceptance standards
Defects
Categories
:
AQL 1 . 0 p e r c e n t d e f e c t i v e
Major
4.4.4.l(a)
Leakage
101
Component missing or incorrectly
102
assembled
103
Soldering incorrect
104
Terminal marking incorrect
105
Protective finish missing or
incorrectly applied
Drain pipe incorrectly assembled
106
4.4.4.3
Insulation resistance
107
Workmanship (3.7)
108
Screw-type fasteners improperly
109
torqued or loose
Discharger body ( D r a w i n g 13-12-51 left hand, and 13-12-52 right
(c)
hand ).
Defects
Categories
None defined
Critical:
AQL 1.0 percent defective
Maj or:
Basic dimensions incorrect
101
Barrel diameter incorrect
102
Barrel depth incorrect
103
104
thickness incorrect
Barrel
wall
105
Spot faces incorrect
106
Location of bosses incorrect
107
Hole locations incorrect
108
Hole sizes incorrect
109
Drain hole location incorrect
110
Surface finish incorrect
Protective finish missing or incorrect
111
Casting quality incorrect
112
Workmanship (3.7)
113
Cover
plate (Drawing 13-12-50).
(d)
Defects
Categories
None defined
Critical:
AQL 1.0 percent defective
Major
Hole
locations incorrect
101
Hole diameters incorrect
102
7
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |