Click here to make tpub.com your Home Page

Page Title: Table I. Examination Schedule
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-L-52906(ME)
.
for preproduction model test, the tests for weight, dump height, reach,
tipping load, lift capacity, breakout forces and raising time shall
be conducted on both the loader equipped with the rock bucket and on
the same loader equipped with the general purpose bucket. The tests
for production run-in, travel speed, drawbar pulls clearance circle,
braking systems, and lifting provisions may be conducted on either the
loader equipped with the rock bucket or the general purpose bucket.
The production run-in test shall be the first test conducted. Failure
of any test shall be cause for rejection.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business