|
| ![]() MIL-L-52906(ME)
6.3 Government-furnished equipment. The contracting officer should
arrange to furnish the equipment specified in 3.28.
6.4 Preproduction models When only loaders equipped with rock
buckets `are being procured, the preproduction test should be conducted with a
loader equipped with a rock bucket. When only loaders equipped with
general purpose buckets are being procured, the preproduction test - -
should be conducted with a loader equipped with a general purpose buckets
When both loaders equipped with rock buckets and loaders equipped with
general purpose buckets are being procured, the preproduction test should
be conducted with a single loader furnished with both a rock bucket and a
general purpose bucket.
Preparing activity:
Custodian:
Army - ME
Army - ME
Project 3805-AO89
User activity:
Army - AT
18
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |