|
| MIL-L-82452A(OS)
TABLE X. Quality conformance test equipment.
4.7.3 Test procedure.
4.7.3.1 Initial test setup.
Position main power circuit breaker on test set to "off".
a.
NOTE:
Verify that exercise head is not connected to test set.
b.
Connect Logic Assembly to exercise head test set drawing 2540510
as shown in figure 3.
c.
Position controls on exercise head test set panel as listed in
table XI.
d.
Position main power circuit breaker on test set to "on" and
connect digital dc voltmeter to meter monitor jacks on test set
panel.
16
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |