|
| MIL-L-83491A(USAF)
MILITARY
Sampling Procedures and Tables for Inspection by Attributes
MIL-STD-105
MIL-STD-129
Marking for Shipment and Storage
DRAWINGS
AIR FORCE
64D2169
Patterns - Storage Pockets, Life Raft
64C2170
Pocket, Storage - Life Raft Assembly
76212
Life Rafts, Inflatable, LRU-16/P and LRU-17/P
(Copies of specifications, standards, drawings, and publications required
by contractors in connection with specific procurement functions should
be obtained from the procuring activity or as directed by the contracting
officer.)
3.
REQUIREMENTS
*
First articles. When specified (see 4.4 and 6.2), the contractor
3.1
shall furnish samples for first article inspection and approval .
3.2
Materials
*
3.2.1
Coated nylon cloth. The material for the primary buoyancy tube, the
canopy, and the floor shall be coated nylon cloth and shall approximately
match 35042 [Lusterless Blue) of FED-STD-595. The coated nylon cloth for
the primary buoyancy tube of the LRU-16/P life raft, the primary buoyancy
tube of the LRU-17/P life raft, and the floor of the LRU-l7/P life raft
shall conform to type I of MIL-C-84389. The coated nylon cloth for the
canopy of the LRU-16/P life raft and the floor of the LRU-l6/P life raft
shall conform to type II of MIL-C-83489.
Design and construction. The design and construction of the life
3.3
raft shall conform to Drawing 76212 and the detail drawings applicable
In the event of conflict between the drawings and the text of
thereto.
this specification, the text of this specification shall govern.
Storage pockets. The parts of the storage pockets of the life raft
3.3.1
shall conform to the patterns referenced on Drawing 64D2169 and shall be
assembled in accordance with Drawing 64C2170.
Inflation assembly. The FLU-2A/P inflation assembly, which is a
3.3.2
component of this life raft, shall not be furnished by the contractor.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |