| MIL-L-85824A(AS)
Sample size criteria, tests and examinations of the life rafts
TABLE III.
and packaging. - continued.
The operation (carbon dioxide)
1/ These Inspections shall be performed in sequence.
inspection shall be performed first and then the leakage inspection.
2/ Pressure tests may be performed prior to final assembly of the life raft, or after
In the event the pressure tests are performed after final assembly,
Final assembly.
the test shall be performed in sequence with operation and leakage test (i.e.,
operations first, pressure second, and leakage last).
3/ The results of the operation, pressure, and leakage inspections shall be
identifiable by the assigned serial numbers, which shall be marked on the life raft,
as specified in 3.7.1.
4/ The gaskets shall be dimensionally checked prior to installation on the life rafts.
Classification of defects for the visual
TABLE IV.
examination of the life rafts.
19
|