Click here to make tpub.com your Home Page

Page Title: Submission of inspection equipment for design approvals.
Back | Up

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-M-13703D (AR)
NOTES
6.
6.1 Intended use.  The components covered by this specification
are intended for use on the Marker, Location, Marine, Dye, AN-M59.
This marker is used to mark reference points on water.  The slick
produced can be seen at a range of 10 miles, from an altitude of
3000 feet.
See MIL-A-48078.
6.2 Ordering data.
6.3 Submission of inspection equipment for design approvals.
See MIL-A-48078.  Submit designs as required to Commander, US Army
Armament, Munitions and Chemical Command, ATTN:  DRSMC-QAT-I(D),
Dover, NJ  07801.
6.4 Drawings.  Drawings listed in Section 2 of this
specification under the heading US Army Armament Research and
Development center (ARDC) may also include drawings prepared by, and
identified as Edgewood Arsenal; Frankford Arsenal, Rock Island
Arsenal, Picatinny Arsenal, or ARRADCOM drawings.  Technical data
originally prepared by these activities is now under the cognizance
of ARDC.
6.5 Equivalent test methods.  The test methods given in this
specification are the official methods to be used.  The contractor
may request using other methods providing that the proposed method
is equivalent (accuracy and precision) to the method given in this
specification.
Prior approval of the Contracting Officer is
required for use of equivalent test methods.  A description of the
proposed method should be submitted through the Contracting Officer
to:  Commander, ARDC, ATTN:  DRSMC-QAR-R(D), Dover, NJ  07801.  This
description should include, but not be limited to, the procedures
used, the accuracy and precision and drawings of any special
equipment required (see MIL-I-45208, paragraph 3.10).
6.6 Changes from Previous Issue.  Asterisks are not used in
this revision to identify changes with respect to the previous
issue, due to the extensiveness of the changes.
Preparing activity:
Custodian:
Army-AR
Army-AR
(Project
1370-A163)
14

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business