Click here to make tpub.com your Home Page

Page Title: Technology Conformance Inspection (TCI).
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-M-38510/13G
3.5 Electrical performance characteristics. The electrical performance characteristics are as specified in table I,
and apply over the full recommended case operating temperature range, unless otherwise specified.
3.6 Electrical test requirements. The electrical test requirements for each device class shall be the subgroups
specified in table II. The electrical tests for each subgroup are described in table III.
3.7 Marking. Marking shall be in accordance with MIL-PRF-38535.
3.8 Microcircuit group assignment. The devices covered by this specification shall be in microcircuit group
number 5 (see MIL-PRF-38535, appendix A).
4. VERIFICATION
4.1 Sampling and inspection. Sampling and inspection procedures shall be in accordance with MIL-PRF-38535
or as modified in the device manufacturer's Quality Management (QM) plan. The modification in the QM plan shall
not effect the form, fit, or function as described herein.
4.2 Screening. Screening shall be in accordance with MIL-PRF-38535 and shall be conducted on all devices prior
to qualification and conformance inspection. The following additional criteria shall apply:
a. The burn-in test duration, test condition, and test temperature, or approved alternatives shall be as
specified in the device manufacturer's QM plan in accordance with MIL-PRF-38535. The burn-in test
circuit shall be maintained under document control by the device manufacturer's Technology Review
Board (TRB) in accordance with MIL-PRF-38535 and shall be made available to the acquiring or
preparing activity upon request. The test circuit shall specify the inputs, outputs, biases, and power
dissipation, as applicable, in accordance with the intent specified in test method 1015 of MIL-STD-883.
b. Interim and final electrical test parameters shall be as specified in table II, except interim electrical
parameters test prior to burn-in is optional at the discretion of the manufacturer.
c. Additional screening for space level product shall be as specified in MIL-PRF-38535.
4.3 Qualification inspection. Qualification inspection shall be in accordance with MIL-PRF-38535.
4.4 Technology Conformance Inspection (TCI). Technology conformance inspection shall be in accordance with
MIL-PRF-38535 and herein for groups A, B, C, and D inspections (see 4.4.1 through 4.4.4).
4.4.1 Group A inspection. Group A inspection shall be in accordance with table III of MIL-PRF-38535 and as
follows:
a. Tests shall be as specified in table II herein.
b. Subgroups 4, 5, and 6 shall be omitted.
4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business