Click here to make tpub.com your Home Page

Page Title: Acquisition requirements.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-M-38510/328C
5. PACKAGING
5.1 Packaging requirements. For acquisition purposes, the packaging requirements shall be as specified in the
contract or order (see 6.2). When actual packaging of materiel is to be performed by DoD or in-house contractor
personnel, these personnel need to contact the responsible packaging activity to ascertain packaging requirements.
Packaging requirements are maintained by the Inventory Control Point's packaging activity within the Military Service
or Defense Agency, or within the military service's system command. Packaging data retrieval is available from the
managing Military Department's or Defense Agency's automated packaging files, CD-ROM products, or by contacting
the responsible packaging activity.
6. NOTES
(This section contains information of a general or explanatory nature which may be helpful, but is not
mandatory.)
6.1 Intended use. Microcircuits conforming to this specification are intended for original equipment design
applications and logistic support of existing equipment.
6.2 Acquisition requirements. Acquisition documents should specify the following:
a.
Title, number, and date of the specification.
b.
PIN and compliance identifier, if applicable (see 1.2).
c.
Requirements for delivery of one copy of the conformance inspection data pertinent to the device
inspection lot to be supplied with each shipment by the device manufacturer, if applicable.
d.
Requirements for certificate of compliance, if applicable.
e.
Requirements for notification of change of product or process to contracting activity in addition to
notification to the qualifying activity, if applicable.
f.
Requirements for failure analysis (including required test condition of method 5003 of MIL-STD-883),
corrective action, and reporting of results, if applicable.
g.
Requirements for product assurance options.
h.
Requirements for special carriers, lead lengths, or lead forming, if applicable. These requirements should
not affect the part number. Unless otherwise specified, these requirements will not apply to direct
purchase by or direct shipment to the Government.
i.
Requirements for "JAN" marking.
j.
Packaging requirements (see 5.1).
69

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business