|
| MIL-M-45013E (AR)
Disposition of tested machine guns (see 4.5.8.6).
g.
Packaging instructions for repair parts (see 5.3).
h.
List of Special Inspection Equipment to be furnished the
i.
contractor (see 4.4.4.l and 4.4.2.1) and responsibilities
for other Government property to be furnished the
contractor.
Responsibility for furnishing ammunition, links, and
j.
bandoleer (see 4.4.4.3).
k.
Responsibility for test firing facilities and operating
procedures (see 6.5).
Shipping instructions for machine guns when an interplant
l.
interchangeability test is required (see 4.4.3.4.2).
Procedures and methods for demilitarizing and disposing
m.
of rejected material.
Disposition of Government furnished property.
n.
Requirement to conduct reliability test.
o.
Requirements for reporting failure analysis (see 4.4.3)
p.
and 6.2 paragraphs) on failures to meet specification
requirements during testing.
Bar code marking requirements.
q.
Contract data requirements for inspection equipment
r.
designs (conforming to Data Item Description DI-DRPR-
81000).
Reporting requirements for failure analysis (conforming
s.
to-Data Item Description DI-R-21598 Tailored).
6.3 Inspection equipment designs Inspection requipment
designs are of two types - Government Special Inspection Equip-
ment (SIE) designs and contractor designs. SIE designs are
designated by drawing numbers under the "Methods of Inspection"
heading in Section 4. Design responsibility for all other
inspection equipment is assigned to the contractor. However, the
contractor need-not furnish any design when a complete Government
SIE is part of the Technical Data Package (TDp). Unless
otherwise specified, the contractor may submit alternate or
modified contractor designs of SIE in accordance with 6.3.2 and
6.3.3 should he elect to do so.
38
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |