Click here to make tpub.com your Home Page

Page Title: Check test for deterioration of primers
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-M-45405C(AR)
4.4.3  Testing.  Testing is described in the First Article and
Quality Conformance Inspection Tables.
Inspection equipment.  The inspection equipment required
4.4.4
to perform the inspections and tests prescribed in this
specification is identified in the "Paragraph Reference/Inspection
Method" column in the tables starting with paragraph 4.4.2.1, and
the test method paragraph (See 4.5).  Thne contractor shall submit
for approval inspection equipment designs in accordance with the
terms of the contract.
See Section 6 of MIL-A-48078 and 6.2 herein.
4.4.5  Check test for deterioration of primers (see
MILP-20444).
If the total time between original acceptance of any
primer  lot and the assembly of that lot into the delay assembly
exceeds two years, or if the primers have been subjected to adverse
conditions, however brief, at any time since previous tests, the
primer lot shall be subjected to and must satisfactorily pass, the
ckeck test for deterioration specified in MIL-P-20444 immediately
before the primer lot is assembled into the delay assembly.  This
test shall be performed by the contractor on primers selected by the
Government Inspector at the facility assembling the primers into the
delay assembly.
(See 6.3)
4.4.6  Warning.  This specification contains sampling procedures
and tests which involve materiel potentially hazardous to
It is emphasized that all applicable safety rules,
personnel.
procedures and regulatory requirements be strictly followed during
the handling, processing and testing of these items.  Hazardous
component safety data sheets contained in the technical data package
contain specific safety-related information.
Methods of inspection.
4.5
The cup assemblies shall
4.5.1  Waterproofness of cup assembly.
The chamber shall be
be placed under water in a vacuum chamber.
evacuated to a minimum pressure differential Of 5 p.s.i. for a
Observation shall be made for
period of 15 seconds, minimum.
leakage as evidenced by air bubbles escaping through the water.
4.5.2 Moisture content of black powder.  The contractor shall
provide adequate temperature and humidity controls in
explosiveloading areas so as to insure compliance with the
The moisture content of each lot of black
applicable requirement.
powder propellant shall be determined at the loading station at the

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business