|
| ![]() MIL-M-45945A
Disposition of Government furnished property.
n.
Requirement to conduct reliability test.
o.
Requirements for reporting failure analysis (see 4.4.3
p.
and 6.2 paragraphs) on failures to meet specification
requirements during testing.
Bar code marking requirements.
q.
Contract data requirements for inspection equipment R-
r.
-
designs (conforming to Data Item Description DI DRP
81000) .
Reporting requirements for failure analysis (conforming
s.
to Data Item Description DI-R-21598 Tailored) .
6.3 Inspection equipment designs. Inspection equipment
designs are of two types - Government Special Inspection Equipment-
ment (SIE) designs and contractor designs. SIE Gesigns are
designated by drawing numbers under the "Methods of Inspection"
heading in Section 4. Design responsibility for all other
inspection equipment is assigned to the contractor. However, the
contractor need not furnish any design when a complete Government
SIE is part of the Technical Data Package (TDP). Unless
otherwise specified,the contractor may submit alternate or
modified contractor designs of SIE in accordance with 6.3.2 and
6.3.3 should he elect to do so.
SIE
designs
may
consist
of
any
of
the
6.3.1 SIE
designs.
following:
Detailed drawings which completely depict all information
a.
necessary for the fabrication and use of the item of
inspection equipment.
A source control drawing or a specification control
b.
drawing as defined in DOD-STD-100.
c.An envelope drawing, as defined in DOD-STD-1OO, which
c.
established the criteria which a detailed design shall
meet . When envelope drawings are specified, the
contractor shall prepare designs which comply with the
criteria therein.
6.3.2 Contractor designs. Contractor designs are required
for all inspection equipment for which SIE designs are not
specified and may include commercial equipment which the
42
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |