Click here to make tpub.com your Home Page

Page Title: Inspection equipment designs.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-M-45945A
Disposition of Government furnished property.
n.
Requirement to conduct reliability test.
o.
Requirements for reporting failure analysis (see 4.4.3
p.
and 6.2 paragraphs) on failures to meet specification
requirements during testing.
Bar code marking requirements.
q.
Contract data requirements for inspection equipment R-
r.
-
designs (conforming to Data Item Description DI DRP
81000) .
Reporting requirements for failure analysis (conforming
s.
to Data Item Description DI-R-21598 Tailored) .
6.3  Inspection  equipment  designs.  Inspection  equipment
designs are of two types - Government Special Inspection Equipment-
ment  (SIE)  designs  and  contractor  designs.  SIE  Gesigns  are
designated by drawing numbers under the "Methods of Inspection"
heading  in  Section  4.  Design  responsibility  for  all  other
inspection equipment is assigned to the contractor. However, the
contractor need not furnish any design when a complete Government
SIE  is  part  of  the  Technical  Data  Package  (TDP).  Unless
otherwise specified,the contractor may submit alternate or
modified contractor designs of SIE in accordance with 6.3.2 and
6.3.3 should he elect to do so.
SIE
designs
may
consist
of
any
of
the
6.3.1  SIE
designs.
following:
Detailed drawings which completely depict all information
a.
necessary for the fabrication and use of the item of
inspection equipment.
A source control drawing or a specification control
b.
drawing as defined in DOD-STD-100.
c.An envelope drawing, as defined in DOD-STD-1OO, which
c.
established the criteria which a detailed design shall
meet .  When envelope drawings are specified, the
contractor shall prepare designs which comply with the
criteria therein.
6.3.2 Contractor  designs.  Contractor  designs  are  required
for all inspection equipment for which SIE designs are not
specified and may include commercial equipment which the
42

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business