| MIL-M-45965(WV)
5.4 Unit packaging, packing and marking of repair parts. Repair parts shall
be unit packaged and packed in accordance with the requirements of MIL-P-14232
and the applicable Packaging Data Sheets for the level of protection specified
in the contract (see 6.2). Marking shall be in accordance with MIL-STD-129.
NOTES
6.
The cannon is intended for either lever-fire or drop-fire
6.1 Intended use.
mode.
Procurement documents should specify the following:
6.2 Ordering data.
6.2.1 Procurement requirements.
a. Title, number and date of this specification.
b. Requirements for submission of and shipping instructions for first
article (see 3.1 and 4.4) and first article package (see 3.1 and 5.1).
(1) The contract should designate the examinations and tests to be
performed by the contractor and the examinations and tests to be performed
by the Government.
(2) The contract should specify the sample size (i.e., the number
of units) of the first article.
(3) The contract should designate the inspection and test data
that is required to be furnished the Government when the contractor is
required to perform either or both examinations and tests.
(4) The contract should designate at whose expense a retest maybe
performed.
(5) The contract should specify that the acceptable first article
shall be delivered in accordance with the terms of the contract, or
(6) Any additional or extended examinations and tests beyond the
scope of this specification should be specified and identified as a separate
item of the contract.
c. List of basic issue items required.
d. Serial numbers to be used for the cannons and the replacement
cannon assemblies.
e. List of inspection equipment, responsibility for acquisition, main-
tenance, and disposition thereof, if other than as specified (see 4.6.2.1).
f. Selection of applicable levels of preservation, packaging, and
packing (see 5.2).
7
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |