|
| MIL-M-45974(WC)
Shipping instructions for first article and pilot pack
c.
(see 3.1, 4.4 and 5.1).
Inspection criteria for component parts and concurrent
d.
repair parts (see 4.5.2.1 and 4.5.3.8).
e.
Shipping instructions for machine guns and parts when
an interplant interchangeability test is required "
(see 4.5.3.6.2).
f.
Responsibility for acquisition, calibration, maintenance
and disposition of inspection equipment, if other than
specified (see 4.5.4.1).
g.
Packaging inspection, if different (see 4.5.5).
Disposition of endurance tested machine guns
h.
(see 4.6.6.6).
i.
Selection of applicable level of protection (A or B),
or commercial packaging (see 5.1, 5.2 and 5.3).
j.
Packaging instructions for repair parts (see 5.4).
Preparing Activity:
Custodian:
Army - WC
Army - WC
Project number:
1OO5-A553
22
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |