|
| MIL-M-45986 (AR)
AMENDMENT 3
Table IV Function Firing
Total Required
Variable Recoil Setting
Sequence #
Rod pull (Lbs)
Long Recoil
Warmer
1
Max. Rod Pull
Long Recoil
2
(Total of both
Short Recoil
3
Long Recoil
4
recoil rods) shall
not exceed 82,000
pound-force.
PAGE 16
Delete and add new paragraph as follows:
"6.3 One (1) copy of the firing report, which shall include
variable data received by this specification and a disitized
computer plot of rod pull versus time for at least the first 300
milliseconds of the recoil cycle, shall be sent to AMSMC-QAR-Q
(D) and SMCAR-LCW-A, AMCCOM, Dover, NJ 07801 for informational
purposes."
Delete original Figure 1 and substitute new Figure 1.
NOTE : The margins of this amendment are marked with an asterrisk
to indicate where. changes (additions, modifications, deletions,
corrections) from the previous amendment were made. This was done
as a convenience only and the Government assumes no liability
whatsoever for any inaccuracies in these notations. Bidders and
contractors are cautioned to evaluate the requirements of this
document based on the entire content irrespective of the marginal
notations and relationship to the last previous amendment.
Preparing Activity:
Custodian: .
Army-AR
Army-AR
(Project 1025 -A141 )
4
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |