| MIL-M-48557A(AR)
retest sample shall be subjected only to the reliability
test(s) which revealed the defect(s).
4.6.3.1 Inspection after retest. Inspection of the sample
after retest shall be conducted by the Government and shall be
in accordance with 4.3.2.2, Final Acceptance Inspection, except
characters 301 and 302 of Table II. Reappearance of the
previous defect(s), 4.6.2, may be cause for the Government to
prescribe mandatory process corrective action by the Contractor
at no additional cost to the Government.
4.7 Methods of inspection.
4.7.1
Environmental.
4.7.1.2 Storage and operating temperatures. The mount
shall be subjected to one cycle of temperature variations in
accordance with Table III. Upon completion of Sequence 1 and 4
soak periods (Storage), the mount shall be visually and
tactually examined to insure conformance with requirements of
3.7.1. Upon completion of Sequene 2 and 4 soak periods
(Operating), the mount shall be visually and tactually examined
to assure conformance with requirements of 3.11. Following
completion of sequence 3 and 5 soak periods (Room Temp.) the
mount shall meet all the requirements of 3.7.6 through 3.10.
TABLE III. Temperature cycle.
4.7.1.3 Shock. This test is applicable to the First
Article Samples and the Reliability Samples only. The mount
shall then be subjected to a shock test in accordance with 3.7.3.
Upon completion of the shock test, the mount shall be examined
and inspected to the requirements of 3.7.3.
4.7.1.4 Vibration "A". This test is applicable to the
Reliability Assurance Sample only. The mout shall be
positioned on Adapter 1.1747196 and secured to the vibration
tester. The mount shall then be subjected to a vibration test
13
|