|
| ![]() MIL-M-48559A(AR)
b. The Mount shall be shocked and conform to the
requirements of paragraph 3.7.3.
c. The Mount shall withstand the Vibration "A"
requirements as noted in paragraph 3.7.4.1.
3.12 Workmanship. The workmanship of MIL-F-13926 shall
apply.
4. QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for inspection. Unless otherwise
specified in the contract or purchase order, the supplier is
responsible for the performance of all inspection requirements as
specified herein. Except as otherwise specified, the supplier may
utilize his own facilities or any other facilities suitable for
the performance of the inspection requirements specified herein,
unless disapproved by the Government. The Government reserves the
right to perform any of the inspections set forth in the
specification where such inspections are deemed necessary to
assure supplies and services conform to prescribed requirements.
4.1.1 Responsibility for compliance. All items must meet
all requirements of sections 3 and 5. The inspection set forth in
this specification shall become a part of the contractor's overall
inspection system or quality program. The absence of any
inspection requirements in the specification shall not relieve the
contractor of the responsibility of assuring that all products or
supplies submitted to the Government for acceptance comply with
all requirements of the contract. Sampling in quality conformance
does not authorize submission of known defective material, either
indicated or actual, nor does it commit the Government to
acceptance of defective material.
4.1.2
General provisions. The conponent and subassembly
inspection
requirements of MIL-F-13926 form a part of the quality
assurance
provisions of this specification. Definitions of
inspection
terms shall be as listed in MIL-STD109.
4.2 First article (initial production) approval. The
requirement for first article approval and the responsibility
(Government or contractor) for first article testing shall be as
specified in the contract. The sample for first article approval
tests shall consist of three (3) mounts plus three (3) each of all
items covered by Quality Assurance Provisions (QAPs). The sample
shall be manufactured in the same manner, using the same
materials, equipment, processes, and procedures as used in regular
production. All parts and materials, including packaging and
packing, shall be obtained from the same source of supply as used
6
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |