| ![]() MIL-M-48559A(AR)
written proposal submitted to the procuring contracting officer
for evaluation and approval by the Government. When required, the
contractor shall demonstrate that the effectiveness of the
proposed alternative(s) is equal to or better than the specified
quality assurance provisions herein. In cases of dispute as to
whether the contractor's proposed alternative(s) provide equal
assurance, the provision of this specification shall apply. All
approved alternative inspection provisions shall be specifically
incorporated into the contractor's quality program or detailed
inspection system, as applicable.
TABLE I. Requirements and test procedures.
4.4 Special sampling.
4.4.1 General. Subsequent to meeting the requirements of
Table I, three quadrants shall be selected at random by a
8
|