Click here to make tpub.com your Home Page

Page Title: Cross level knob torque.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-M-48559A(AR)
4.10.2 Azimuth adjustment. Follow the above procedure for
alignment and reticle coincidence. Azimuth adjustment shall be
inspected by adjusting the opposing screws located in the mounting
bracket assembly 10554687. Azimuth movement is activated by
backing off one of the screws and turning in the opposing screw.
Rotation of screw will be performed until azimuth movement has
reached the limits and or stops. This procedure will be repeated
once to right and then left until the line of sight has traveled
to the limits specified in 3.8.3.2.
4.11
Operability.
4.11.1 Cross level knob torque. Use a standard torque
measuring device with adapter 11738144 to test starting and
running torque as specified in 3.9.1.
4.11.2  Boresight  adjustment  torque  elevation.  Use  a
standard torque measuring device with adapter 11738143 to test
starting and running torque as specified in 3.9.2
4.12
Interchangeability.
4.12.1 Mounting surface for Quadrant M18. Each mount shall
be inspected for maximum fit conditions in accordance with 3.10.1,
using the interchangeability gage 11747844. Any mount which does
not accept the interchangeability gage shall be rejected.
4.12.2 Mounting surface of Mount M172. Each mount shall be
inspected for maximum fit conditions in accordance with 3.10.3
using the interchangeability gage 11747840. Any mount which does
not accept the interchangeability gage shall be rejected.
4.12.3 Mounting surface for Telescope, Elbow M18. Each
mount shall be inspected for maximum fit conditions in accordance
with 3.10.3, using the interchangeability gage 11747978. Any
mount which does not accept the interchangeability gage shall be
rejected.
4.13 Packaging inspection. The preservation, packing, and
marking shall be inspected to verify conformance to the require-
ments of 5.1.
5.
PACKAGING
5.1  Packaging,  packing  and  marking.  Packaging,  packing,  and
marking shall be in accordance with MIL-P-14232 and Packaging Data
Sheet 10554823. The level of protection shall be as specified in
the procurement document.
14

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business