MIL-M-53008(ME)
AMENDMENT 2
Item
Quantity
Identification
No.
Description
Camouflage
As
Pattern drawings
1
required"
patterns
* 3.13 Lubricants.  The procedure for the selection of lubricants shall be in
accordance with MIL-STD-838, section 5.  Lubricants selected shall be in
accordance with MIL-HDBK-113, chapter 2.  When the specification of the
lubricant selected includes a requirement for a qualified products list (QPL),
the lubricant supplied shall be from a source that is listed on the applicable
QPL."
PAGE 6
Add new paragraphs:
"4.4.3 Tests."
"4.4.3.1 Samples.  Samples selected in accordance with 4.4.1 shall be
subjected to the following tests, plus any other tests specified by the
contracting activity to comply with requirement of 3.3. Failure of any test
shall be cause for rejection."
"4.4.3.2 Test Installation of Mine Roller.  One mounting kit shall be
installed on an M60 tank.  One roller kit, mine clearing in accordance with
MIL-R-53007 shall be mounted on to the installed mounting kit using the winches
and other mounting equipment provided with the mine roller and mine roller
mounting kit. The mine roller shall be released and remounted at least twice
using the hydraulic release mechanism and twice using the manual release
mechanism. During the mounting and release of the roller, the operation shall
be observed and any interference of the parts noted."
"4.4.3.3 Operational Test.  Following installation of a mine roller, an
operational test of the mounting kit shall be conducted consisting of 2 miles of
level cross-country operation. During the operational test, both left and right
turns and forward and reverse operations shall be demonstrated. Following the
operational test, the mine roller shall be released and remounted. at least twice
using the hydraulic release mechanism and twice using the manual release
mechanism. During the mounting and release of the roller, the operation shall
be observed and any interference of the parts noted.  Initial production
operational tests for a mine roller kit and a mine roller mounting kit may be
run concurrently."
PAGE 7
Table 1. under maior characteristics add:
3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business