|
| MIL-M-63287(AR)
4.4.3 Testing. Testing is described in the First Ar-
ticle and Quality Conformance Inspection tables.
4.4.4 Inspection equipment. The inspection equipment
(gage) require to perform the Inspections and tests prescri-
bed in this specification is identified in the `Paragraph
Reference/ Inspection Method' column in the tables starting
with paragraph 4.4.2.1, and the test method paragraph (see
4.5). The contractor shall submit for approval, inspection
equipment designs in accordance with the terms of the
See Section 6 of MIL-A-48078, and 6.3 herein.
contract.
Test methods and procedures.
4.5
4.5.1 Leakage test of case assembly. The leakage test
shall be performed as specified on dwg. 9292639. Equipment
used in performing the test shall be in accordance with 4.4.4.
5.
PACKAGING
Packaging shall be Level B
Preservation-packaging.
5.1
in accordance with MIL-STD-1169.
Packing shall be Level B in accordance
5.2 Packing.
with MIL-STD-1169.
5.3 Marking.
Marking shall be Level B in accordance
with MIL-STD-1169.
NOTES .
6.
Intended use. The metal parts covered by ths speci-
6.1
fication are intended for assembly of the XM74 antipersonnel
mine.
6.2 Ordering data.
Procurement documents shall specify
the following:
Title, number, and date of this specification.
a.
b.
Provisions of MIL-A-48078.
c.
Provisions for submission of first article
samples.
6.3 Submission of inspection equipment designs for
Submit equipment designs as
(See MIL-A-48078).
app roval.
required, to Commander, U.S. Army Armament Research and
Development Command, ATTN: DRDAR-QAA-I, Dover, New Jersey
07801.
19
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |