| ![]() MIL-M-63333(AR)
TABLE I - CLASSIFICATION OF DEFECTS
REQUIREMENT
CLASS
TEST PROCEDURE
CRITICAL : NONE
MAJOR: AQL .65% Defective
101. Rigidity, pre-vibration
3.7.3
4.6.3
3.5
102. Vibration
4.6.4
103. Rigidity, post-vibration
3.7.3
4.6.5
104. Mounting repeatability
3.7.2
4.6.6
105. Insertion and removal
3.7.1
4.6.8
106. Periscope locking lever - operability
3.8.1.1
4.6.9.1
107. Shield actuating handle - operability
4.6.9.2
3.8.1.2
108. Handle locking latch - operability
4.6.9.3
3.8.1.3
109. Circuitry
3.9
4.6.10
110. Interchangeability - mechanical
3.10.1
4.6.11.1
MINOR :
NONE DEFINED
0
NOTE :
The tests in Table I shall be conducted at a temperature between +60
and +90F.
4.3.3 Acceptance and rejection. Rejected lots shall be screened for all
defective characteristics. Removal. or correction of defective units and
resubmittance of rejected lots shall be in accordance with "Acceptance and
Rejection" as specified in MIL-STD-105.
4.4 Special sampling.
4.4.1 General. One mount shall be selected at random by a Government
representative as a control sample fron each 100 produced. The control sample
shall meet the requirements and tests in Table II.
TABLE 11
CONTROL TEST
REQUIREMENT
TEST PROCEDURE
Fabrication
301.
3.1
Applicable Drawings - Visual
General specifications
302.
3.2
MIL-F-13926 - Visual
4.4.2 Environmental. Three mounts shall be selected at random as samples
fron each 50 produced, or from each month's production, whichever occurs
first. Each sample shall meet the requirements and tests in Table III and
shall then meet the requirements and tests in Table I.
6
|