|
| MIL-M-63456A(AR)
APPENDIX A
Applicable.
20.2
Other Publications.
Applicable.
20.3
Order of precedence.
REQUIREMENTS
30.
30.1
Material.
Applicable.
30.2 Components and assemblies. This paragraph is applicable
except that Dwg. 9292710 is replaced by Dwg. 9347080.
30.3 Pretest of main charge explosive. This paragraph is not
applicable to this appendix (not applicable).
Not applicable.
30.4 HE explosive exudation.
Applicable.
30.5 Verification of safe condition of body assembly.
30.6 Verification of body assembly circuit resistance.
Applicable.
30.7 Anti-disturbance (AD) mode functioning.
Applicable.
30.8 Documentation of plan for safety in handling and processing
of munitions. Applicable.
Additionally, this plan shall include the procedures that will
be used to assure total segregation of the Test BLU 92 (AP-40)
from the Tactical BLU 92/B and special test configurations.
Applicable.
30.9 First article inspection.
Applicable.
3O.1O Data requirements.
Applicable.
30.11 Workmanship.
30.12 Verification of inert fill. Each Inert Kill Mechanism
(Dwg. 9347082) and Mine BLU 92/B (AP-40) (Dwg. 9347080) shall be
examined to verify that it is inert loaded.
40.
QUALITY ASSURANCE PROVISIONS
Applicable.
40.1 Responsibility for inspection.
Applicable.
40.1.1 Responsibility for compliance.
Applicable.
40.2 Classification of inspections.
22
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |