| 
 | ||||||||||
| 
 |  MIL-M-63457A(AR) APPENDIX A 40. 5.5.1 Self-destruct (SD) mode.  This paragraph is applicable except that the mines should not be destroyed but failure analyzed 40.5.6  Moisture and volatiles content of charge assembly. Applicable. 40.5.7 Leakage test of propellant charge assembly. Not Applicable. 40.5.8  Verification of inert mine assembly.  Each mine assembly shall be radiographer to verify the presence of a main charge simulant and booster simulant. 50. PACKAGING Additionally, the Test 50.1 Packaging requirements.  Applicable. BLU 91/B (AT-40) shall be stored separately from the Test BLU 91/B - (AT-20) and the Tactical BLU 91/B. 60. NOTES 60.1 Intended use.  The Test Mine, BLU 91/B (AT-40) covered by this Specification is intended for use in two types of Test Dispensers, CBU 89 (T-4)/B and CBU 78 (T-4)/B. 60.2 Ordering data. Applicable. 60.3  Submission of inspection equipment design for approval. Applicable. 60.4  Distribution of ammunition data cards and test data. Applicable. Applicable. 60.5 Drawings. 60.6 Premature arming; premature detonation; early self-destruct (SD); enable time; hazardous duds; non-hazardous dud (Dud); high order function.  This paragraph is applicable with the phrase "of the mine" deleted in subparagraphs b & c.  Additionally, subparagraph g is redefined as follows: "g.  High order functioning.  High order functioning will be evidenced by high order detonation of the S&A main charge leads". 60.7 Submission of results from contractor conducted examinations and tests.  Applicable. 60.8 Submission of procedures. Applicable. 60.9 Data requirements. Applicable. Changes from previous issue. Applicable. 60.10 Applicable. Subject term (key word) listing. 60.11 45 | 
| 
 Privacy Statement - Press Release - Copyright Information. - Contact Us |