Click here to make tpub.com your Home Page

Page Title: Hydraulic system.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-M-63995 (AR)
4.4 First aritcle.
4.4.1 First article sample.  A first article sample shall be
selected from early production and submitted for testing at a
location approved by-the Government in accordance with the
contract requirements (see 6.2).  The sample shall be
representative of the production processes to be used during
quantity production.
4.4.2 First article inspection.  The first article sample
inspection shall be inspected to determine conformance with the
requirements of this specification.
4.4.3 First article rejection.  If any sample fails to comply
with any of the applicable requirements,  the first article sample
shall be rejected.  The Government reserves the right to terminate
its inspection upon any failure of the sample to comply with the
requirements of this specification.
Quality conformance inspection.
4.5
4.5.1 Sampling.  Each mount shall be inspected for compliance
with the specification except sampling for proof firing as
specified in 4.7.4 shall be the first three production mounts, and
one from each two month's production or one from each twenty-five
produced.  In addition, the first three production mounts shall be
climatically fired as specified in 3.4.4.  Failure to comply with
the specified requirements shall be cause for rejection.
4.5.2 Examination.
4.5.2.1 Materials.  Materials used in the manufacture of
mounts shall be examined and tested in accordance with the
material specifications referenced on the applicable drawings.
The contractor's inspection records shall be checked to determine
conformance to 3.2.
4.5.2.2 Hydraulic system.  To determine compliance with
3.3.1, a minimum of one pint of oil shall be removed from each
recoil cylinder of each mount.  The sample shall be taken within
five minutes after gymnastication.  Evidence of particles
exceeding 3.3.1 shall be cause for rejection.
4.5.2.3 Surface cleanliness.  Each mount shall be examined to
determine compliance with the cleanliness requirements specified
in 3.3.2.  Failure to comply with 3.3.2 shall be cause for
rejection of the mount.
13

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business