|
| MIL-M-81392(AS)
given below. Upon rejection of any lot, the next lot, in addition to the
applicable sampling plan, shall be examined, tested and accepted for the
requirement(s) which caused the rejection, unless the requirement(s) is
included in the applicable inspection plan.
STEP 1. Upon starting production or delivery of an acceptable preproduc-
tion sample, as applicable, the first two production lots shall be examined
as required in 4.2, tested in the sequence and accepted in conformance with
Table I, Sampling Plan A.
STEP 2. Production lots other than those defined in Steps 1 and 3 shall be
examined as required in 4.2, tested in the sequence and accepted in confor-
mance with Table I, Sampling Plan B, except that one lot shall be randomly
selected from each five consecutive production lots and examined as required
in 4.2, tested in the sequence and accepted in conformance with Table I,
Sampling Plan A.
STEP 3. After continuous production of lots containing a maximum total of
ten production lots, the next production lot shall be examined as required
in 4.2, tested in the sequence and accepted in conformance with Table I,
Sampling Plan C. Upon failure of the temperature and humidity test sequence,
corrective action must be incorporated into the production process immedi-
ately. The first complete lot incorporating the corrective action must meet
the requirements of the temperature and humidity test sequence.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |