MIL-M-82376B
3.3.1.2.7.2 (N,F) Equipment shall be selected from the list of tools and
test equipment approved by the Government by means of Aerospace Ground
Equipment (AGE) listings, Special Support Equipment (SSE) listings, Ground
Support Equipment (GSE) listings, the Federal Supply Catalog, provisioning
conferences , Engineering Change Proposals (ECPs), Trainer Change Proposals
(TCPs), Training Equipment Change Directives (TECDs) and procurement
documents.  When the contractor cannot obtain an approved list, the manual
shall show the contractor's recommendations.  However, these recommendations
shall be changed promptly to conform to the official Government list as soon
as such information is provided to the contractor.
3.3.1.2.7.3 (A) Test, Measurement, and Diagnostic Equipment (TMDE) shall
be selected from the DA TMDE Register, DA PAM 700-21, the DA Preferred Items
List (PIL), DA PAM 700-21-1 or as indicated in AR 750-43, the DA TMDE Program.
3.3.1.2.8 Illustrations of units and assemblies. A unit, assembly, or
subassembly description shall be illustrated by a line drawing followed by a
brief description of the equipment.  This shall include rack maps of printed
circuit card racks or assemblies as applicable.  The view shall be such that,
when considered with the text, it shall contribute the most information to a
reader interested at the moment only in a particular unit, assembly, or
subassembly. Components shall be indexed as specified in MIL-M-38784.
3.3.1.3 Section II - Installation.  This section shall provide overall
training device requirements required at the device site, installation
instructions, installation test procedures, and post-installation test
procedures.  The procedures and associated data tables contained in this
section will enable maintenance personnel to configure, test, and relocate the
training device.
3.3.1.3.1
Preparation for use.  Instructions shall be given for providing
facilities for the training device prior to installation.
3.3.1.3.1.1 Facilities.
(A,N) Detailed information such as power
requirements, inputs and outputs, humidity, electrostatic discharge, space
requirements, minimum opening required for entry of the entire training device
or its unassembled units shall be provided.
Weights and dimensions of units,
and special requirements such as ventilation, illumination, air conditioning,
levelness of the floor, and weight distribution of the training device at its
final location shall also be provided.
3.3.1.3.1.2 (F) The requirements of 3.3.1.3.1.1 shall apply unless
otherwise specified and shall contain all data required in the event that the
training device is moved.
3.3.1.3.2 Unpacking and repacking for reshipment.  (A,N) Complete and
simple instructions shall be provided for personnel to unpack and repack the
training device, including specific instructions for the salvage of special
material required for repacking.  Instructions shall be illustrated if
necessary for clarification.