| MIL-N-81207A(AS)
Special Test Schedule - Selection of equipments for
4.4.4.1
special tests shall be made as follows:
(1) On an early equipment after an engineering
or material change.
(2) Whenever failure reports or other information
indicate additional tests are required. This
will be determined by procuring activity).
Scope of Tests - Special tests shall consist of such
4.4.4.2
tests as approved by the procuring activity. Test procedures PreviOUSly
approved for the preproduction tests shall be used where applicable.
When not applicable, the contract shall prepare a test procedure and
submit it to the procuring activity for approval prior to conducting
the tests.
Equipment Failure - Should a failure occur during
4.4.5
either the sampling, reliability assurance or special tests, the
following action shall be taken:
(1) Determine the cause of failure.
Determine if the failure is an isolated case
(2)
or design defect.
(3) Submit to the procuring activity for approval,
prposed corrective action intended to reduce
the possibility of same failure(s) OCCuring
in future tests.
62
|