| MIL-N-81207A(AS)
Periodically, the equipment shall be turned on and off several
times and put through its various phases of operation.
Performance Check - At approximately 8-hours
4.5.3
intervals during the test, a limited performance check shall be
made. The performance check proposed by the contractor shall be
subject to approval by the procuring activity.
Test Data - The contractor shall keep a daily
4.5.4
record of the performance of the equipment, making particular note
of any deficiencies or failures. In the event of part failures,
the defective part shall be replaced and the operation resumed for
the balance of the test period. A record shall be kept of all
failures throughout the test, including all tube failures. This
record shall indicate the following:
(1)
Part type number
(2)
The circuit reference symbol number
The part function
(3)
Name of the manufacturer
(4)
Nature of the failure
(5)
The number of hours which the part
(6)
operated prior to failure
Failure Report - In the event of a failure, the
4.5.4.1
Government inspector shall be notified immediately. A report
shall be submitted to the procuring activity upon completion of
the test. In this report, the contractor shall propose suitable
and adequate design or material corrections for all failures which
occurred. The procuring activity will review such proposals and
determine whether they are acceptable.
Reconditioning Of Life Test Samples - An
4.5.5
equipment which has been subjected to the life test shall be
reconditioned as follows:
(1) On completion of the life test, the
equipment shall be reworked by the
contractor by replacing all "wear" items.
The "wear" items shall be determined by
64
|