MIL-N-81604C(AS)
Para 4.2.3
(cont)
to be submitted for acceptance.  The preproduction sample shall
not be considered as one of the equipments under the contract.
4.2.4 Production Equipments - Equipments supplied under the
contract shall in all respects, including design, construction,
workmanship, performance and quality, be equivalent to the
approved preproduction sample.  Each equipment shall be capable
of successfully passing the same tests as imposed on the pre-
production sample.  Evidence of noncompliance with the above
*
shall constitute cause for rejection and, for equipment already
accepted by the Government, it shall be the obligation of the
contractor to make necessary corrections as approved by the pro-
curing activity.
4.3 Initial Production Tests - One of the first ten production
*
equipments shall be selected and sent, at the contractor's ex-
pense, to a designated Government laboratory for tests.  This
equipment shall be selected by the procuring activity after the
equipment has successfully passed all individual tests. No
other tests shall be conducted on equipment prior to starting
*
the initial production tests.  The preproduction sample shall
not be selected for this test.
4.3.1 Scope of Tests - This equipment may be subjected to any
*
and all tests which the procuring activity deems necessary to
assure that the production equipment is equivalent to the pre-
viously approved preproduction sample in design, construction
*
workmanship, performance and quality, and that it meets all
applicable requirements.
4.3.2 Accessory Material - In addition to the complete equipment
*
submitted for initial production tests, the contractor shall
*
also submit any accessory material and data necessary to test
the equipment.
4.3.3 Initial Production Sample Approval - Approval of the
*
initial production sample shall be by the procuring activity
upon satisfactory completion of all tests.  Any design, material, *
or performance defect made evident during this test shall be
corrected by the contractor to the satisfaction of the procuring
activity.  Failure of the initial production sample to pass any *
of the tests shall be cause for deliveries of equipment under
the contract to cease until proper corrective action is approved
and accomplished.  Corrective action shall also be accomplished
on equipment previously accepted when requested by the procuring
activity.
134