Click here to make tpub.com your Home Page

Page Title: Quality Assurance Provisions
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-P-17639F(SH)
3.10.2 The TRS format and content shall conform to DOD-STD-2147 and shall
be approved and validated in accordance with this standard.
4.
QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for inspection.  Unless otherwise specified in the
contract or purchase order, the contractor is responsible for the performance
of all inspection requirements as specified herein.  Except as otherwise
specified in the contract or purchase order, the contractor may use his own or
any other facilities suitable for the performance of the inspection requirements
specified herein, unless disapproved by the Government.  The Government reserves
the right to perform any of the inspections set forth in the specification where
such inspections are deemed necessary to assure supplies and services conform to
prescribed  requirements.
4.1.1 Inspection system.  The inspection system which the contractor is
required to maintain, as provided in the Inspection clause of the contract or
order, shall be in accordance with MIL-I-45208 (see 6.2.1). The completed parts
examination (see 4.1.1.1) shall fulfill the completed articles inspection
requirements of MIL-I-45208 (see 6.2.1).
4.1.1.1 The inspection system shall include a completed parts examination
procedure whereby each functionally and dimensionally critical part and assembly,
including the final product, is examined on completion in accordance with a
completed parts examination check list accompanying each part or assembly
(see 4.5).
4.1.1.2 A copy of the completed parts examination check list for the
completed pump, identified by manufacturer's serial number, shall be furnished
the contracting activity (see 6.2.2) in duplicate for each pump.  On these
copies the contractors quality control manager shall certify that the
inspection requirements specified herein have been fulfilled and that the unit
is in accordance with the approved drawings and the applicable specifications.
4.1.2 Variations.  No variations or deviations from approved design
drawings in 3.6.1.2 shall be permitted.
4.1.3 Mercury prohibition.  Pumps, drivers, and auxiliary parts furnished
by the pump contractor shall be free of mercury contamination and free of
functional mercury.  During the manufacturing processes, checks, examinations
and tests, the product being offered for acceptance shall not come in direct
contact with mercury, any of its compounds, nor with any mercury containing
device, such as gauges and thermometers.  The manufacturer shall certify that
the product, when shipped, is free from mercury contamination.
4.2 Classification of inspections.
The inspection requirements specified
herein are classified as follows:
(a) First article inspection (see 4.3).
(b) Quality conformance inspection (see 4.4).
40

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business