|
| MIL-R-1296F(AR)
4.4.3 Testing.
4.4.3.1 Failure data. Unless otherwise specified, all
tests shall be conducted on a complete rifle. If test
requirements cited herein are not met, acceptance of the rifle
shall be deferred and the contractor shall accomplish, as
applicable, the following actions:
Conduct a failure analysis study Performing a
a.
dimensional physical and visual examination of the components
which are suspected to be the cause of failure or malfunction.
Evaluate and correct the applicable production
b.
processes and procedures to prevent recurrence of the same
defect(s) in future production.
Examine rifles, partially assembled rifles and
c.
components (including components and subassemblies at in-process
or final assembly) to ensure that material containing the same
defect is purged from the inventory and not presented to the
Government for acceptance.
Submit the results of the failure analysis and the
d.
corrective actions taken to the Government for review and
approval prior to submitting a reconditioned lot or reconditioned
rifle or retest.
4.4.3.2 Trigger pull rear sight safety actuation force, pull,
high-pressure resistance and headspace, functioning, and
targeting and accurcy testing Each rifle shall be tested as
specified in 4.4.3.3.
19
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |