|
| MIL-R-13577c
* 4.5.2.2 Certification. Unless otherwise specified, the contractor
shall furnish certified statements that each inspection lot conforms to
the applicable drawings, specification of the materials and processes
specified (see 6.2).
* 4.5.3 Packaging examination and testing. Unless otherwise speci-
fied (see .2), the packaging examination and the testing shall be in accor-
dance with MIL-P-14232.
5. PREPARATION FOR DELIVERY
*
5.1 Pilot pack. The pilot peck shall consist of a cleanig rod or
cleaning rods as required by and packaged in accordance with the appli-
cable packaging data sheet for the level of protection specified in the
contract (see 6.2), packed lev81 c and f-arded In accordance with 3.1.
*
5.2 Preservation, packaging packing and marking. Rods shall be
presened, packaged} packed and marked In accordance with the applicable
packing. data sheet for the level of protection specified in the contract
(see 6.2)
6. NOTES
* 6.1 Intended use. This specification 1S itended to cover$ but not
be limited to, procurement of the following cleaning rods:
Nomenclature
Drawing
Rod, Cleaning} Cal. .45, M4
C5564102
-
Rodt Cleaning, Shotgun, M9.
C6301446
-
Rod, Cleaning, Jointed$ Cal. .30, M1
16508237
-
Rod, Cleaning, Jointed, Cal. .50, M7.
D6535441
-
Rod, Cleaning, Jointed, Caliber .30, M1O.
D7162920
-
Staff, Cleaning, 20mm (5 Section Aluminum
D8766012
-
Alloy Rod).
Rod, Cleaning, small Arms M11E3.
C8436777 -
*
Procurement documents should specify the
6.2 Ordering data.
following :
Title, number and date of this specification.
List of applicable drawings and specifications pertinent to
b
the cleaning rods, showing applicable revision dates.
Requirements for submission of first article and pilot peck
c.
(see 3.1, 4.4 and 5.1).
5
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |