Accumulator. Assure that the accumulator is precharged
d.
(see 3.4.7)
with dry nitrogen to approximately 750 psi.
Starting power supply.
3.18.2
Close the outlet shutoff valve. This shall prevent flow
a.
of hydraulic oil to simulated load.
Open bypass valve. This shall allow fluid within the
b.
power supply to return to the reservoir.
Place selector switch in OFF position. This 3 position
c.
switch shall control the DC power supply output,
allowing either battery charging or DC output mode of
operation.
When the MASTER switch is In the ON position, the Green
d.
Indicator shall light.
e.
When the Motor Start Switch is depressed, the hydraulic
pump motor and heat exchanger fan shall operate.
Hydraulic operation.
3.18.3
a.
TO adjust the pump compensator, close the bypass valve
and adjust for 1500 psi as read on the high-pressure
gage located on the control panel.
TO adjust the pump volume control, open the bypass valve
b.
.1 GPM as read on the flow
and adjust for the 3.5
meter.
c.
Close bypass valve.
When the outlet shutoff valve is fully open, hydraulic
d.
fluid shall be applied to the simulated load.
e.
During operation, if the high pressure filter becomes
partially clogged causing a differential pressure across
it of 35
5 psi gage, the differential pressure switch
shall light the red indicator located on the control
panel.
If the temperature of the hydraulic fluid reaches 175
f.
deg.F or higher, the power supply shall shut down
automatically thru the. action of the thermostatic
switch.
Stopping hydraulic operation.
g.
(1) Close outlet shutoff valve.
(2) Open bypass valve.
motor shall stop.
(3) Press motor stop switch, the
DC supply system operation.
3.18.4
Preliminary adjustments.
a.
(1) Disconnect AC power supply cable cable from
source.
9
|