Click here to make tpub.com your Home Page

Page Title: Periscope, Tank: M35E1
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-P-48450A(AR)
AMENDMENT 1
15 October 1979
MILITARY SPECIFICATION
PERISCOPE, TANK: M35E1
This amendment forms a part of Military Specification MIL-P-48450A(MU)
dated 15 March 1976.
PAGE 3
Paragraph 3.4.3.1 - Delete and substitute:
"3.4.3.1 Vibration "A".  This requirement shall be met with the
image intensifier tube and reticle projector lamp energized by the
application of +24 6.O VDC to Contact 11733497 (Reference Drawing
11733401).  The vibration input to the periscope shall be at the
interface of the periscope and mount.  Vibration shall be applied
along each of three mutually perpendicular axes of the periscope. The
vibration shall be shall be sinusoidal as follows:
a. A frequency of 5 Hertz(Hz), the acceleration shall be .5 G
10%.
b.  During a frequency sweep of 5 to 9 Hz, increase acceleration
linearly from .5 G to 1.5 G's lO%.
c. During a frequency sweep of 9 to 500 Hz, maintain constant
acceleration of 1.5 G's 10%.
d. During a frequency sweep of 500 to 9 Hz, maintain constant
acceleration of 1.5 G's 10%.
During a frequency sweep of 9 to 5 Hz, decrease acceleration
linearly from 1.5 G's to .5 G lO%.
f.
At 5 Hz, the acceleration shall be .5 G l0%.
The frequency of applied vibration shall be swept logarithmically in
15 minute + 1 minute sweep cycles for a total of two hours per axis.
There shall be no failure or flicker of light emission from the image
intensifier tube nor the reticle projector lamp during vibration and
the periscope shall show no evidence of physical failure subsequent to
vibration.  Following the vibration test the persicope shall meet the
requirements of 3.6.3.2, 3.6.4.1, 3.6.9, 3.6.2, 3.6.3.1, 3.6.3.1.1,
3.6.3.1.2, 3.6.5, 3.6.6, 3.6.6.1, 3.6.7, 3.6.8, 3.2, 3.1, 3.5 and then
each module (see 3.1) shall meet their own respective post-vibration
test requirements."
FSC 1240

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business