Click here to make tpub.com your Home Page

Page Title: Shock -Cont.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 




img
MIL-P-48450A(AR)
AMENDMENT 1
the periscope only).  The shock pulse shall have a half sine wave with
a time duration of 18 3 milliseconds.  Subsequent to shock, there
shall be no failure or flicker of light emission from the image tube
nor the reticle projector lamp.  The periscope shall also show no
evidence of physical failure.  Following the shock test, the periscope
shall meet the requirements o 3.6.3.2, 3.6.4.1, 3.6.9, 3.6.2, 3.6.3.1,
3.6.3.1.1, 3.6.3.1.2, 3.6.5, 3.6.6, 3.6.6.1, 3.6.7, 3.6.8, 3.2, 3.1,
3.5 and then each module (see 3.1) shall meet their own respective
post-shock test requirements."
PAGE 5
Paragraph 3.6.1.a, Line 1 - Delete "four" and substitute "three".
PAGE 6
Paragraph 3.6.3.l.1, Line 3 - Delete "0.2 mil" and substitute "1.0 mil"
Preparing Activity:
Custodian:
Army-AR
Army-AR
Project No. 1240-A735
Page 3 of 3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business